Wednesday, 4 Nov 2026
Subscribe to AIWatcher
AIWatcher
  • Home
  • News

    An AI edited a small model’s weights and doubled its math score

    By
    AIWadmin

    Thieves are renting out cloud AI keys pilfered from enterprises

    By
    AIWadmin

    Britain’s cyber agency sets a two-year clock on AI-written ransomware

    By
    AIWadmin

    Anthropic’s compute bill now eats a bigger share of every dollar

    By
    AIWadmin

    A benchmark asks agents to size switchboards and check roof decks

    By
    AIWadmin

    Apple will stop treating a chatbot boyfriend as an app for kids

    By
    AIWadmin
  • Articles

    Trajectory raises $45M to let specialists retrain models without researchers

    By
    AIWadmin

    Switching off AI in schools now means switching off Google search

    By
    AIWadmin

    CrowdStrike buys two agent monitors and ships a kill switch

    By
    AIWadmin

    SemiAnalysis built a benchmark no frontier model can pass

    By
    AIWadmin

    A British chip startup reaches a $6.5B value before shipping a wafer

    By
    AIWadmin

    Seoul puts $16B behind chips and its own frontier models

    By
    AIWadmin
  • Spotlight

    Envision pushes 800-volt power straight into a working AI campus

    By
    AIWadmin

    42AI leaves stealth with $62.5M to model how people decide

    By
    AIWadmin

    Tohoku and Aisin stash a whole model beside the arithmetic

    By
    AIWadmin

    Western startups are editing Chinese models until they sound American

    By
    AIWadmin

    Omen AI buys Aquatic Labs to watch what cools the racks

    By
    AIWadmin

    LG CNS hands over a 30-megawatt AI hall in Jakarta

    By
    AIWadmin
  • About
    • Mission
    • Services
    • Contact
  • Newsletter
  • Shop
    • All Items
    • By Category
      • Hats
      • T-Shirts
    • Cart
  • 🔥
  • Alignment
  • Classification
  • Distillation
  • Explainability
  • Hallucination
  • Legal/Compliance
  • Medical
  • NLM
  • Mobility
  • Research
  • Robotics
  • Safety
  • Startups
  • Prompt
  • Python
  • RAG
  • RLHF
  • Token
  • Vision
Font ResizerAa
AIWatcherAIWatcher
  • Home
  • News
  • Articles
  • Spotlight
  • About
  • Newsletter
  • Shop
Search
  • Home
  • News
  • Articles
  • Spotlight
  • About
    • Mission
    • Services
    • Contact
  • Newsletter
  • Shop
    • All Items
    • By Category
    • Cart
Have an existing account? Sign In
Follow US
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
News

LG CNS hands over a 30-megawatt AI hall in Jakarta

The facility is the first AI data centre a Korean company has built for an overseas client, with room to grow to 400MW.

AIWadmin
Last updated: November 2, 2026 7:30 pm
AIWadmin
ByAIWadmin
Global AI news & information.
Follow:
Share
SHARE

A 30MW hyperscale AI data centre in Jakarta is finished, LG Group’s information technology arm said Monday. The customer behind the build is a joint venture called KMG, formed by Indonesia’s Sinar Mas Group with Korea Investment Real Asset Management.

Contents
Cooling built for dense racksA regional race with Korean plumbing

The company describes it as the first time a Korean firm has delivered an AI data centre for a client outside the country. Expansion into Malaysia, Thailand, Vietnam and Japan is planned.

Cooling built for dense racks

The hall uses hybrid air and liquid cooling to hold racks above 300 kW, a density that would be unmanageable with air alone. The site is designed to scale as far as 400MW.

Density is the constraint operators in hot climates care about most. Ambient temperatures raise the cost of air cooling, and Southeast Asian grids are not uniformly prepared for a single customer drawing hundreds of megawatts.

A regional race with Korean plumbing

Jakarta sits in the middle of a build-out where Gulf, Chinese and US operators are all competing for land, power and permits. Korea’s entry is being sold less on model training than on construction and integration work.

Whether the design keeps its economics will depend on the power contracts behind it, which LG CNS and KMG have not disclosed.

For now the deliverable is a working hall with a small initial draw and a very large design ceiling, which is how most of this year’s new AI capacity arrives.

TAGGED:AI InfrastructureCoolingData CentersIndonesiaLG CNSSoutheast Asia
SOURCES:The Korea Herald
Share This Article
Email Copy Link Print
ByAIWadmin
Follow:
Global AI news & information.
Previous Article Memory suppliers outprofit five US tech giants for the first time
Next Article Omen AI buys Aquatic Labs to watch what cools the racks

You Might Also Like

News

Japan Airlines bets humanoid robots can beat the airport labor crunch at Haneda

By
AIWadmin
News

Yardstik banks $30M to watch workers after hiring day

By
AIWadmin
News

OpenAI adds GPT-5.6 Cyber and splits Daybreak into two tiers

By
AIWadmin
News

Brockman’s Private Journal Becomes a Weapon in Musk vs. OpenAI War

By
AIWadmin
AIWatcher
Facebook Twitter Youtube Linkedin Rss

Global AI News and Information
AIWatcher is your definitive source for AI updates worldwide, from Silicon Valley to Shanghai.
Our industry coverage keeps you in the loop with the latest news and trends shaping the future of AI.

Quick Links
  • News
  • Articles
  • Spotlight
  • Events
About Us
  • Mission
  • Services
  • Contact
  • Privacy Policy
  • Legal
© 2026 AIWatcher. All Rights Reserved.